How Angelo Underground Delivered a Complex Storm Drain Project in Beaverton
When Keith Green Construction needed emergency storm drain repairs at a busy commercial property in Beaverton, they turned to Angelo Underground for a complete solution. This project showcased our ability to handle complex utility work while keeping businesses running smoothly.
The Project Challenge
Keith Green Construction contacted us about a critical storm drainage system failure. The existing storm drain had multiple collapsed sections that needed immediate attention.
Key challenges included:
- Working around multiple existing utilities (communication, power, and gas lines)
- Maintaining full access for tenants during construction
- Meeting strict City of Beaverton specifications
- Coordinating with city officials for permitting and inspections
- Weather-dependent scheduling requirements
Our Comprehensive Solution
Angelo Underground developed a turnkey approach that addressed every aspect of the project from start to finish.
Original scope of work:
- Remove 125 linear feet of failed 6″ storm pipe
- Install new 6″ 3034 storm/sewer pipe replacement
- Install 3 new metal catch basins to match existing sizes
- Replace ADA-compliant sidewalk ramps
- Complete asphalt and sidewalk patching to city specifications
- Provide hydro jetting, pipe cleaning, and camera inspection
- Implement erosion control measures
- Handle bench removal/reinstallation and final site cleanup
Field adjustments during construction: As with many excavation projects, site conditions revealed additional work needed:
- Installed 55 linear feet of ductile iron pipe in specific areas
- Used specialized ductile iron fittings (1 Wye, 2 x 45° bends, 1 x 22° bend)
- Connected 25 linear feet of rain drain into the new catch basin system
- Replaced an additional 4′ x 5′ sidewalk panel per ROW inspector instructions
Why Our Experience Made the Difference
Angelo Underground’s expertise proved crucial throughout this project:
Regulatory expertise: Our established relationships with City of Beaverton officials enabled smooth permitting, bonding, and inspection processes.
Equipment capabilities: We deployed our Ring-O-Matic Excavator, TB260 Excavator, and hydro excavator for precision work around sensitive utilities.
Flexible approach: When site conditions required changes, we quickly adapted with alternative materials and methods.
Minimal disruption: Our phased work plan with inspection milestones kept the commercial property fully operational.
Project Results
The completed project delivered exactly what Keith Green Construction needed:
Infrastructure improvements:
- Full stormwater drainage functionality restored
- ADA-compliant sidewalks installed
- All work completed to City of Beaverton specifications
- Enhanced site safety and drainage capacity
Process excellence:
- All inspections passed on the first attempt
- Zero safety incidents throughout the project
- Completed on schedule within the one-month timeline
- Minimal disruption to tenant operations
Client Satisfaction
“We recently had the opportunity to work with Angelo Underground on a storm drain project in Beaverton. The process was smooth and efficient based on Michael’s professionalism and open communication. I look forward to working with them again on future projects and highly recommend them to anyone needing excavation work.”
— Keith Green Construction
Keith Green Construction has continued to partner with Angelo Underground for additional projects, demonstrating the lasting value of our professional relationship.
Safety and Compliance
Safety remained our top priority throughout the project:
- Zero safety incidents reported
- Comprehensive safety measures, including barricades and traffic cones
- Steel plate protection where needed
- ADA-compliant pedestrian detours as required by the City of Beaverton