Trenching for Gas and Electric Lines in Portland: PGE and NW Natural Requirements
NW Natural wants a gas service line 18 to 24 inches below final grade and 12 inches from other utilities. PGE wants its conduit under at least 30 inches of cover. Each utility’s full trench rules, how a joint trench comes together, and who can dig in the street.